Agilent Technologies E8285A Video Games User Manual


 
414
S:\agilent\e8285\REFGUIDE\MANUAL\fields.chp
Chapter 4, Description of Fields
Fields
Steps
This field allows entry of the number of power control bits that the Test Set will
send to the mobile station through the power control subchannel when the
Execute field is selected.
GPIB Example
“DISP CTXR;CDMA:PCONtrol:STEPs 100”
selects 100 power control bits to be sent on the power control subchannel.
Operating Considerations
Range of values: 1 through 150
See Also
Closed Loop Pwr Cntl
field description, on page 203,
Change field description, on page 193
Execute (Closed Loop Power Control Change)
field description, on page
251
Screens Where Field is Present
CDMA TRANSMITTER POWER RANGE TEST
Step Size
This field is displayed on the OPEN LOOP TIME RESPONSE screen when
“Main” is selected in the
"Controls (Open Loop Time Response)" field on page 212.
This field allows entry of the step increase in the Test Set’s output power to be
used in the next execution of the open loop power control test.
-25 dB
-20 dB
-15 dB
-10 dB
+10 dB
+15 dB
+20 dB
+25 dB
GPIB Example
“CDMA:OLTR:STEP ‘+20 dB’”
selects a step increase of +20 dB when the next time response to open loop power
control test is executed.