177
Chapter 4, Description of Fields
Fields
Autostart Test Procedure on Power-Up
When set to On, this field automatically loads and runs the specified procedure
whenever the Test Set is turned on. If this field is set to
Off or the specified
procedure cannot be loaded for any reason (such as, memory card not inserted,
disk drive not connected), the Test Set will default to its normal power-on state.
Screens Where Field is Present
TESTS (Execution Conditions)
Auto Zero
This field allows power measurement zeroing to occur automatically, based on
temperature changes sensed within the Test Set.
• Auto automatically zeroes power measurements periodically.
• Manual requires selection of the TX Pwr Zero field to zero power measurements.
Operating Considerations
Automatic power measurement zeroing will occur unless overridden by the user
selecting Manual in this field.
Screens Where Field is Present
ADJACENT CHANNEL POWER
RF ANALYZER