D9412GV3/D7412GV3 | Program Entry Guide | 4.0 Schedules (Skeds) EN | 117
Bosch Security Systems, Inc. | 10/11 | F01U170807-02
Default: 0
Selection: 0 to 24, 28, 29
S## Defer Test
Yes Defer the Test
Report.
Default: No
Selection: Yes or No
Enable sked to defer the Test
Report
No Send the Test
Report on
schedule.
S## Hourly Report
Yes
Send the Test
Report every hour.
9
Test Report: This function emulates
the Test Report? sub-function of the
Send Report? keypad function
([COMMAND][4][1]). This function
generates a Test Report only from
Area 1 but contains panel-wide status
information. The report is sent to the
phone(s) programmed for Test and
Status Reports in Section 2.3.8
Communication Attempts on page 18.
If Expand Test Report in Phone
parameters is programmed as Yes,
the Test Report also includes all off-
normal states for events listed in Test
Reports (refer to Table 12 on page
23) and some events listed in
Diagnostic Reports (refer to the
footnotes with Table 13 on page 24)
The Test Report can be deferred if
any other report was sent since the
last Test Report. To defer the Test
Report, program S## Defer Test.
The Test Report can be sent every
hour beginning at the time scheduled
in S## Time. To send a Test Report
every hour, program S## Hourly
Report.
To meet UL 864
requirements, use the
Sked function to meet the
daily Test Report
requirement.
Default: No
Selection: Yes or No
Select Yes to send the Test
Report every hour.
No
Send the Test
Report only as
scheduled.
S## Defer Status
Yes Defer the Status
Report.
10
Status Report: This function
generates a Status Report for each
area that is enabled. The report is
sent to the phone(s) programmed for
Test and Status Reports in Routing.
The Status Report can be deferred if
any other report was sent since the
last Status Report. To defer the
Status Report, program S## Defer
Status.
Default: No
Selection: Yes or No
Enable sked to defer the
Status Report.
No Send the Status
Report on
schedule.
(Continued on next page.)