Infortrend SentinelRAID 170 320ML/sec SCSI-to-SCSI RAID Controller Video Game Controller User Manual


 
SentinelRAID 170 Installation and Hardware Reference Manual
2-8 Battery Backup Unit (BBU) Installation
Figure 2-4: Install the Battery Charger Board
Step 4. Connect the BBU cable. The BBU cable can be connected to a white, 4-
pin header on either the BBU charger board (see Figure 2-5) or at the
back of the controller board (labeled J4) (see Figure 2-6). If the BBU
cable is going to be connected to the charger board, the connections
should be made now. If the BBU is going to be connected to the
connector at the back of the board, the connection can be made now or
after the chassis top cover has been replaced.
Figure 2-5: Connect the BBU to the BBU Charger Board