
MMB Web-UI (Web User Interface) Operations
(2) Window Operations
1. Click the [Status Clear] button. Selects the power control items related to each partition from the pull-
down list of [Power Control]. Then click the [Apply] button.
Dialog box for setting confirmation appears.
2. Click [OK] button to execute the settings.
[Message]
This section describes the messages to be displayed on this window.
Partition#aa cannot execute sadump
Partition#aa cannot execute Power On.
Partition#aa cannot execute Power Off.
Partition#aa command failed
Partition#%aa cannot execute Power Cycle.
Partition#%aa cannot execute Reset.
Partition#%aa cannot execute NMI.
Partition#%aa cannot execute Force Power Off.
Force Power Off Delay setting failed.
Unable to power on the partition#%aa due to CPU mismatch between SBs.
Unable to Power On the Partition#%aa because this Partition is under maintenance.
Unable to %aa the Partition#%aa because this Partition is under maintenance.
Unable to power on the partition#%aa due to CPU composition abnormal.
Unable to power on due to mismatch between supply voltage and input voltage.
Unable to power on the partition#%aa due to DIMM composition abnormal.
Unable to power on the partition#%aa due to DIMM does not satisfy requirements of
Mirror Mode.
The Power On failed, because of switching the Home SB.
Please execute it after a while again.
Unable to power on the partition#%d due to abnormal SB composition.
Unable to power on the partition#%d due to abnormal VRM composition.
For details on the messages displayed on the window, see PRIMEQUEST 2000 Series Message Reference
(C122-E178EN).
1.3.2 [Schedule] Menu
The [Schedule] menu has the [Schedule Control] and [Schedule List] windows. This section describes the
windows and the operation.
Note
As mentioned below, there may be a delay in the time recorded in SEL compared to the time reserved for
scheduled operations.
After checking the configuration and after performing the start up preparation process, it takes some
time until the power is ON. In this case, the SEL display is delayed about from six seconds up to 8
seconds than the time reserved for the scheduled operations.
The shutdown instructions from MMB to OPERATING SYSTEM take certain time from the set time.
However, the following interval times may be changed under the various conditions like setting and the
configuration.
Interval time until shutdown instructions reaches OS from MMB.
Interval time until MMB notifies SEL begin shutdown after OS begins shutdown.
Even if the [Power on Delay] is 0 seconds, it takes about 30 seconds ~ 70 seconds from starting the
power on up to the reset.
[Schedule Control] window
In the [Schedule Control] window, the setting related to the schedule can be set for each partition.