Sega LTM170E6-L04 Video Game Console User Manual


 
25
www.seuservice.com
FIG. 6. 6 a NETWORK CHECKING SCREEN
TURNING POWER ON
To turn on the power, turn the AC unit main switch in the main projection unit to ON, as well the power
switches in all of the satellite AC units.
Unless all of the power switches are turned to ON, an error will be detected in the network check that is
automatically carried out after powering up.
After power is turned on, the main projection unit billboard, the side frame fluorescent lamps on the right and
left, and all the satellite fluorescent lamps will be illuminated.
Following display of the Naomi system startup screens on the main projection and satellite monitors, the
network check will be displayed. After network check completion, advertising screens will appear.
In the event of communication connection problems or other errors, each monitor will alternate between the
network check and Naomi logo screens, and the advertising screens will not appear.
If the advertising screens fail to appear, please refer to the Service Manual included with the product in order
to identify and resolve the error.
Note that when power to this product is interrupted, marginal coins (i.e., those that do not represent a full
credit) and bonus adder data will be lost. As long as power is supplied and the game is running, it will repeat
the total of 16 seasons and 96 races. When power has been interrupted, the game will start with the first race
of the season in progress at the time of the interruption. For example, if power is turned off during the 4th
race of the 10th season, the game will resume from the 1st race of the 10th season after power is restored.
6
MODE : SLAVE
SIZE : XXXX
GAP : 0000
STATUS : 0000
CHECKING NETWORK
wait ing MASTE R
MODE : MASTER
SIZE : XXXX
GAP : 0000
STATUS : 0000
CHECKING NETWORK
***Note: Image Differs From Actual Unit.
Please read the Service Manual accompanying the product, utilize the test modes for each station and the
main projection unit, and check the various input/output devices and screen settings. Every possible check is
conducted prior to shipping the product from the factory, but the passage of time and/or vibration experienced
during transport may result in the need for further adjustments.
ASSEMBLY CHECK
7