● Appropriate work clothes should be worn
when performing work. Gloves and safety
shoes should be worn in order to prevent ac
-
cidents and injuries.
● Be sure to exercise caution in handling the projector screen, as it is easily dam-
aged. Damaged screens cannot be repaired; they must be replaced.
● Because the screen is difficult to view at an angle, be sure to carefully consider
the positioning of the satellites.
● If protective cable cov-
ers are used for cables
on the floor, these should
be of a shape and mate-
rial that will not cause
passersby to trip. Covers
likely to induce tripping
can cause accidents.
STOP
IMPORTANT!
CAUTION!
When carrying out the assembling and installation, follow the following 8-item sequence.
ASSEMBLING AND POSITIONING THE MAIN PROJECTION UNIT
SECURING THE STATIONS
POWER SUPPLY, AND EARTH CONNECTION
COMMUNICATION CONNECTIONS
SETTING THE CARDS
TURNING POWER ON
1
2
3
4
5
6