Atari 040-0050-01 Video Game Console User Manual


 
Section 3 – Power ON and Test the Cabinet
gvrSX™ Conversion System Manual
Page 26 of 48 040-0050-01 Rev. A 10/29/2004
Section 3 – Power ON and Test the Cabinet
Before powering the cabinet ON for the first time, please verify the following:
AC power is correctly setup inside the cabinet.
The DC power supply is correctly setup to provide power to the Jamma Conversion
Board.
All connections are correct and secure.
Once you have verified that all hardware is installed correctly, power ON the cabinet and
verify that the game starts and runs properly, and that all controls function properly.
Use the Player Control Test (see page 33) from the Operator Menu to verify that the joystick
and buttons are working properly.
Insert some coins and verify that the coin inputs are working properly.
Start a game (see page 35) and verify that it plays properly.
Run the Joystick Calibration Utility
The Joystick Calibration Utility adjusts the software to match the joystick motion. Run the
Joystick Calibration Utility whenever you replace the joystick or install game software on the
system.
1. Insert the Joystick Calibration Utility CD in the computer CD-drive. The CD will run
automatically. You will see a series of processing screens, followed by windows telling
you to move the joystick in certain ways.
2. Move the joystick as instructed by the onscreen prompts.
3. Ignore the windows that refer to "Throttle" and "Rudder." Simply click the trigger to exit
from these windows.