Service Procedures: Preventive Maintenance Site Form
InfraStruXure InRow RC 27
Environment: Yes/No
2. Is space environment suitable for unit operation?
3. Record environment Temperature and Humidity.
Temp: Humid:
4. Is there signs of damage to the system?
5.
Is there sufficient service access?
Minimum front access is 36"
Front
ccess
Date: Time
Cleanliness: Yes/No
For Monthly & Quarterly PM Visits
1. Is the exterior of the unit Clean?
2.
Has the return Air filters been cleaned (standard filter) or replaced
Optional 30%
3. Is the interior of the unit clean?
For Semi-Annual PM Visits-
4.
What is the condition of the evaporator coil?
Mechanical Checks: Yes/No
For Monthly & Quarterly PM Visits
1. Blowers move freely with no noise
2. Is the condensate line and Pump free of leaks, clean and
operational
3.
What is the Chilled Water set point for the Chiller supplying Chilled
Water to the unit? Temp:
For Semi-Annual PM Visits-
4. What is the concentration of glycol in the system?
% of
Glycol:
Electrical Checks: Yes/No
For Monthly & Quarterly PM Visits
1. Does the electrical panel pass visual inspection
2. Does the nominal unit current draw match unit nameplate?
Unit Label
Main
Current
Unit Label UPS
Current
Actual Main
Current
Actual UPS
Current
3. Does Mains & UPS voltage match Unit nameplate?
Unit Main
volta
Unit UPS
volta
e
Actual Main
volta
Actual UPS
volta
Record Name Plate voltage info and actual
Record Name Plate info and actual current
Comments:
Comments:
Comments:
Alarm Description:
7.
List the alarm log below.
Unit Alarms:
Description of Customers Concerns:
6. List any of the customers concerns below. Customer Concerns:
Comments:
1.
What type of room is the cooling solution located in (Data center, wiring closet, ect)