Service Procedures: Preventive Maintenance Site Form
28 InfraStruXure InRow RC
For Semi-Annual PM Visits
4. Has all the wiring terminations in the control panel been checked for
ti
htness?
Functional Checks: Yes/No
For Monthly & Quarterly PM Visits
1. Does the unit maintain Temperature Control?
2.
Is the Chilled Water actuator fastened securely on the Chilled Water
valve bod
3. Does the Chilled Water actuator respond to changes in demand for
coolin
?
For Semi-Annual PM Visits-
4. Do the unit alarms function properly?
5. Is the unit being seen by the ISX Manager if equipped
6. Is the unit being seen by the BMS (Building Management System) If
e
i
ed
Unit Configuration: Yes/No
For Monthly & Quarterly PM Visits
Set Points: Set Points
1. Cooling (Only used when unit is configured for In-Row)
2.
Supply Air
3. Fan Speed
Onl
used when unit is confi
ured for HACS or RACS
For Semi-Annual PM Visits
Thresholds:
Set Points
4. Rack Inlet
5. Inlet Fluid
6. Supply Air
7. Return Air
8.
ir filte
9. Fan 1
10. Fan 2
11.
Fan 3
12. Fan 4
13. Fan 5
14. Fan 6
15. Fan
16.
Fan 8
17. Power Supply 1
18. Power Supply 2
19. Condensate Pump
20.
ir filter
21.
Air filter alarm enable/disable
Redundant Group Configuration:
22. Number of units in the group?
23. All the units in the group respond to changes in control?
24. Changes in setpoint with one unit are shown in all units?
25.
All units in the group working off the same hot aisle?
Final Checks: Yes/No
1. The interior/Exterior of the unit is clean free of debris?
2. The area around the Unit is clean and orderly?
3. List the firmware for the unit.
Unit Panel
View Unit Controlle
NMC AO
NMC Hardware
Current Firmware installed on unit.
Up Graded Firmware to the following
List operating firmware on the unit
General Comments:
Comments:
Service Interval
Comments:
Comments:
Comments:
Comments:
Run Hours