Chapter 2 Quick Start
To Prepare the Power Supply for Use
23
2
To Prepare the Power Supply for Use
The following steps help you verify that the power supply is ready for use.
1
Check the list of supplied items.
Verify that you have received the following items with your power supply. If
anything is missing, contact your nearest Agilent Technologies Sales Office.
One appropriate power cord for your location.
One User's Guide.
This Service Guide.
Certificate of Calibration.
2
Verify that the correct power-line voltage setting is selected and that
the correct power-line fuse is installed.
The line voltage is set to 100, 115 or 230 Vac from the factory according to the
input power option selected when you ordered the power supply. Change the
voltage setting if it is not correct for your location (see the next page for
detailed information). For 100 or 115 Vac operation, the correct fuse is 4 AT
(Agilent part number 2110-0996) and for 230 Vac operation, the correct fuse is
2.5 AT (Agilent part number 2110-0999).
3
Connect the power cord and turn on the power supply.
A power-on self-test occurs automatically when you turn on the power supply.
The front-panel display will light up while the power supply performs its
power-on self- test. After performing the self-test, the power supply will go into
the power-on / reset state; all outputs are disabled (the
OFF annunciator turns
on); the 15V/7A rage is selected (the +
15V annunciator turns on); the knob is
selected for voltage control. Notice that the
OVP and OCP annunciators also
turn on.
4
Enable the outputs.
Press the key to enable the outputs. The
OFF annunciator
turns off and the
15V, OVP, OCP and CV annunciators are lit. The blinking digit
can be adjusted by turning the knob. Notice that the display is in the meter
mode. "Meter mode" means that the display shows the actual output voltage
and current.
Power
Output On/Off
Output On/Off