A SERVICE OF

logo

2
Installing the SpectraLink 8000
SVP Server
As shown in the system diagram, the SVP Server is connected to the
Ethernet switch. The specifications covered here allow for great
flexibility in physical placement of the components within stated
guidelines.
See the Configuration and Administration document for your vendor’s
IP system for information on LAN requirements, network
infrastructure and IP addressing.
Required Materials
The following equipment must be provided by the customer.
Power Outlet – AC adapter provided by Polycom.
Backboard space – the SVP Server is designed to be wall- mounted
to 3/4" plywood securely screwed to the wall.
Screws – required to mount the SVP Server to the wall. Four #8
3/4" panhead wood screws (or similar device) are required.
Cat. 5 Cable – RJ-45 connector at the SVP Server. Connection to
Ethernet switch.
Locate the SVP Server
The SVP Server measures approximately 4 x 12.5 x 7 inches, and
weighs about five pounds. The unit can be wall- mounted, vertically
or horizontally, over ¾" plywood. The SVP Server can also be rack-
mounted using a rack- mount kit (sold separately).
PN: 1725-36031-001_G.doc
19