A SERVICE OF

logo

02/04 P/N 21145507
23
18.
35
31
29
29
1" (2.54 cm)
C
O
N
C
R
E
T
E
1
19.
Insert bolt (31) through left side
short elevator tube (29), then
stretch spring or springs (34) onto
bolt (31). Insert bolt (31) through
right side short elevator tube (29)
and secure with nut (35).
Secure pole end with tape (not included).
Fill pole with concrete approximately 1”
(2.54 cm) below bottom elevator hole as
shown.
NOTE: Make sure that concrete does not
bulge from the end of pole assembly.
Allow concrete to completely cure.
USE EYE PROTECTION
WHEN INSTALLING
SPRINGS.
WARNING!
Failure to fill your
pole completely with
concrete as described
in these instructions
will void all warranties
written and implied.
IMPORTANT!:
IMPORTANT!:
WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP22.
CONCRETE MUST
CURE.
34