![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/8/f0/8f00a1ee-7182-4bde-aff2-69bf62212633/8f00a1ee-7182-4bde-aff2-69bf62212633-bg38.png)
PAGE 56 — DCA-180SSJU — OPERATION AND PARTS MANUAL — REV. #3 (02/01/10)
Normal Shutdown Procedure
To shutdown the generator use the following procedure:
1. Place both the MAIN, GFCI and LOAD circuit breakers
as shown in Figure 40 to the OFF position.
2. Place the engine speed switch (Figure 58) in the “
” (down) position.
Figure 59. MPEC Control Switch (Off/Reset)
5. Verify that the status LED on the MPEC display
are OFF (not lit).
6. Remove all loads from the generator.
7. Inspect entire generator for any damage or loosening of
components that may have occured during operation.
GENERATOR SHUT-DOWN PROCEDURES
3. Let the engine cool by running it at low speed for 3-5
minutes with no load applied.
4. Place the (Figure 59) to the
OFF/RESET position.
Figure 58. Engine Speed Switch (Low)
NEVER stop the engine suddenly except in an emergency.
WARNING -
SHUTTING DOWN THE
GENERATOR
ALWAYS make sure the diagnostic switch is placed in the
OFF position before attempting to shut down the generator.
The OFF/RESET switch on the MEC controller will not shut
down the generator if the diagnostic switch is left in the
ON position.
CAUTION -
DIAGNOSTIC SWITCH
Emergency Shutdown Procedure
To shutdown the generator in the event of an emergency
use the following procedure:
1. Place the (Figure 59) in the
OFF/RESET position.