A SERVICE OF

logo

10 Adam Equipment 2010 ©
The Indicator bracket is fitted to the PTS using 4 x M4 screws as the picture
below shows, these should be tightened using the Allen Key supplied .
The Indicator cable goes through the hole on the bracket and connects to the
Indicator using the 7 pin connector.
M4 x 6 Screws
4 places
7 pin connector
fitted here.