A SERVICE OF

logo

6
4 - 6 mm
Outer tube
Hex screws
Handle
Moutning
plate
Throttle assembly
Adjusting the handle
4 - 6
mm
Loosen the fasteners on the air lter cover
Adjusting throttle lever free play
Assembly and adjustments
Prior to assembly
This Shindaiwa Multipurpose Tool Car-
rier comes fully assembled. You only
need attach the accessory tool of your
choice to the powerhead. Your Multi-
purpose tool carrier includes:
IMPORTANT!
The terms “left”, “left-hand”, and
“LH”; “right”, “right-hand”, and “RH”;
“front” and “rear” refer to directions as
viewed by the operator during normal
operation.
Throttle lever free play
The thro
ttle lever free play should
be approximately 4 - 6 mm. Make
sure that the throttle lever operates
smoothly without binding. If it becomes
necessary to adjust the lever free play,
follow the procedures and illustrations
that follow.
Loosen the air cleaner cover knobs 1.
and remove the air cleaner cover.
Turn the cable adjuster in or out as 2.
required to obtain proper free play
4-6 mm (3/16-1/4 inch).
Reinstall the air cleaner cover.3.
This owner/operators’s manual
Tool kit for routine maintenance.
Tool kits vary by model and may
include a hex wrench, and a spark
plug/screwdriver combination
wrench.
Handle
Your Shindaiwa Multi-Purpose Tool
Carrier comes with the handle
installed. It can be re-adjusted for oper-
ator comfort in the following manner.
Loosen the four hex screws..1.
Rotate/slide handle assembly to best 2.
position for operator comfort, usually
25 cm (10 in.) ahead of the throttle
assembly.
Tighten hex screws in a crisscross 3.
manner.
Cable
Adjuster