A SERVICE OF

logo

4
Preparation for Installation
Install 1/2” IPS nipples for the hot and cold
water supplies at the locations shown on
the diagram. The nipples should extend
5/8” outside the surface of the finish wall.
For proper operation of the unit, the hot
supply should be on the left, and the cold
supply should be on the right.
Install the wall surface material. Make sure
that the wall is watertight before installing
the panel.
Seal the wall around the nipples with
waterproof sealant.